GE 16x 16 Channel HDXT 3T MRI System with New style covers
<
>
Seller Information
PM Imaging Management
Phone: 866-208-6513
5812 W Pico Blvd. Suite B,
Los Angeles, CA 90019
United States
Not yet rated
  • Description
  • Specifications
  • Request a Quote
  • Date of Manufacture 2007, Current Helium Level 64.33 (will be filled to ramp down properly)

    Hardware: SR80/SR150, GRADIENT TYPE 8916 HFD, MAGNET ENCLOSURE TYPE WIDE OPEN TIGHT FIT, SUMITOMO 408-A3 COLDHEAD INSTALLED FEB 2016, SUMITOMO F-50h compressor and Lines Replaced Feb 2018, 2 Chillers included and under service Contract- GE Main Disconnect Cabinet, GE DC Lighting Controller, RF Amplifier, 35kw RF Amplifier

    Software and Options: Software Applications level 16.X Software Options: EPI, FAST GRADIENT ECHO CINE, FSE & FLAIR, TIME OF FLIGHT, VASCULAR IMAGING, RESEARCH, RESEARCH PSD, SPECTRO PROBE SGD ECHOSPEED, DW EPI, FLAIR EPI, SPECIAL, SMART PREP, SSFSE, THREE PLANE LOCALIZER, MODALITY WORKLIST E3DTOF, FSE XL, BLOODSUPP, FASTCINE, TAGGING, SGDPERF, IDRIVE PRO, IDRIVE, SMARTPREP 2000 UPGRADE PROBE 2000 UPGRADE, MULTI-NUCLEAR SPECTROSCOPY, FUNCTOOL 2, VOXTOOL, INTERACTIVE VASCULAR, MAGING, CLAIRVIEW, SPECTRO ANALYSIS GE, PERFORMED PROCEDURE STEP, FGRET, IDRIVE PRO PLUS PROBE 3D BRAIN, ULTRA TR, T2 BREATHHOLD, SSFSE MRCP, T1 BREATHHOLD, ACGD PLUS, FLUORO TAGGERED MRA, MRCP3, FIESTA 2D, FIESTA 3D, DELAYED ENHANCEMENT, ASSET, 3DFRFSE, ASSET PLUS, TRICKS, FIESTA-C, BREAST2, PROPELLER DWI, 3D DELAYED ENHANCEMENTS, FAT SAT FIESTA, PROPELLER T2, 16 CHANNEL SYSTEM, LAVA, FLAIR2D, MULTI PHASE (VARIABLE DELAY), BLOOD FLOW AND, VOLUME MEASUREMENT, T2MAP, 2DMERGE, LAVA-XV, BREAST SINGLE VOXEL, COSMIC, HDX KEY, 3D DUAL ECHO, ARC, CUBE T2

    Coils: pending inspection 10/29/2019

    System to be Ramped Down 10/30, System Rigged Out 11/6 Load and transported
  • Manufacturer
    GE
    Condition
    used
    Available Date
    October 29, 2019
  • Kevin@pmimagingmgmt.com

You are not the author of this post and/or do not have permission to edit it!